Projects
Downingtown East High School and Downingtown STEM High School had lighting fixtures with outdated consoles that couldn’t fully control their system. Illuminated Integration recommended updated lighting consoles and provided programming and training in both auditoriums. II programmed many looks for the room, such as your typical choir and assembly presets. At the end of training, their teams were equipped with the knowledge to access all of the programmed lighting presets, create their own, and navigate the lighting console. An ETC control system was installed to provide both simple and advanced control from wall mounted touch screens and a theatrical lighting console.